Indus AI Data Center Hub

The Indus AI Data Center Hub in Alberta brings together the critical inputs required for large-scale digital infrastructure, including land, power, water, and connectivity. Designed with a power-first approach, the project supports the delivery of AI and high-performance computing infrastructure while aligning with long-term regional growth and community priorities.

1,500+

Construction Jobs

1,494 MWe

Generation Capacity

300

Operational Jobs

800km

FIBER NETWORK

Infrastructure & Entitlementsn

Strategic Location

Located within Alberta’s established energy and infrastructure corridor, the site provides access to the land, power, and connectivity required to support long-term, scalable digital infrastructure development.

World-class connectivity

Fiber infrastructure integrated early in the development process to support reliable telecommunications access for businesses, public services, and future data center operations.

Reliable, diverse power

Large-scale on-site power generation with up to 1,494 MWe capacity, designed to meet growing demand for digital infrastructure while supporting grid reliability and reducing pressure on public energy resources through a bring-your-own-power approach.

Integrated Ecosystem for Reliable Delivery

Employment

Investment

Project Details

Size

400 acres

Ready for Service (RFS) Date

Q1 2030

Alberta, Canada

Power

1,494 MWe natural gas-fired power generation facility designed to supply approximately 1,200 MWe to co-located on-site data halls, with on-site generation supporting a bring-your-own-power model and optional grid interconnection for resiliency.

Fiber

Integrated fiber infrastructure supporting world-class telecommunications connectivity for public services, businesses, and residents.

Water

Estimated daily water use of up to 1,500 cubic meters per day across data center operations and power generation, with ongoing evaluation of greywater reuse and closed-loop water systems to support responsible water management.

Why Canada, Why Now?

Nec lectus et integer convallis potenti si suscipit neque etiam. At ad convallis sociosqu tempus bibendum elementum si. Auctor nec hendrerit facilisi duis tincidunt lorem lobortis tristique eu leo donec. Mattis ac ante suspendisse mi amet.

BUSINESS GROWTH

AI-driven workloads are fueling rapid growth expansion across customer platforms.

SCALABLE, FLEXIBLE CAMPUSES

Campuses engineered to scale with evolving power and density requirements supporting current needs and future demand.

PACE OF GROWTH

Reliable delivery beginning as early as 2028, enabling Beacon to meet accelerated onboarding timelines.

AI SOVEREIGNTY

Anchor the infrastructure, talent, and IP in Canada to capture long-term economic growth and global competitiveness.

Featured Projects

Ridiculus nisi vel dictumst quam nunc dolor nascetur suscipit. Hac ornare mauris nostra id habitasse.

Harry Smith AI Data Center Hub

Saunders Lake AI Data Center Hub